Here is one of our truckies George driving the forklift with one of the freight cases. This process continues until the entire freight is packed ready to go to the airport. The freight will be delivered to the circuit in Singapore then unloaded and assembled into the garage. The set-up takes approx two days, but only six hours to pack down back into the cases for the next event.


✅ Check out more posts with related topics: